Kurtz Solar SLF (27INR0305)

Kurtz Solar SLF is a 101.9 MW solar interconnection project in Atascosa, Texas with a current status of operational. It is proposed to connect at Tap 69kV #8206 Charlotte - #8607 Jourdanton.

101.9 MWCapacity
OperationalStatus
AtascosaMarket
SolarTechnology

Project facts

Canonical nameKurtz Solar SLF
Queue ID27INR0305
Statusoperational
Source statusSS Completed, FIS Started, No IA
MarketAtascosa
TechnologySolar
Capacity101.9 MW
StateTexas
CountyAtascosa
Point of interconnectionTap 69kV #8206 Charlotte - #8607 Jourdanton
Requested (queue) date2024-09-04
Proposed in-service date
Operational date2029-05-31
Withdrawn date
DeveloperKurtz Solar, LLC
Utility / transmission ownerERCOT

Cross-source records

This project is also observed in: Lawrence Berkeley National Laboratory — Queued Up interconnection dataset. interXdata links these source records without double-counting the project.

What changed

ObservedFieldOld valueNew valueMateriality
2026-07-31new_projectoperationalhigh

Explore related data

Source last checked2026-08-01
Data last materially changed2026-08-01
Page data generated2026-08-27

Provenance: ERCOT — Generation Interconnection Status (GIS) report. Values are normalized from public source records into the interXdata canonical warehouse; see each source for original filings.

Follow this project and get an alert when its status, capacity, developer, or schedule changes.

Start tracking with interXdata