KY Queue Project 25RSC-005 — Battery in McCracken, Kentucky

KY Queue Project 25RSC-005 — Battery in McCracken, Kentucky is a 250.0 MW battery interconnection project in McCracken, Kentucky with a current status of active. It is proposed to connect at SHF MARTIN REACTOR - SHAWNEE- MARTIN, KY 161KV SWITCHING STATION.

250.0 MWCapacity
ActiveStatus
KYMarket
BatteryTechnology

Project facts

Canonical nameKY Queue Project 25RSC-005 — Battery in McCracken, Kentucky
Queue ID25RSC-005
Statusactive
Source statusCluster Study
MarketKY
TechnologyBattery
Capacity250.0 MW
StateKentucky
CountyMcCracken
Point of interconnectionSHF MARTIN REACTOR - SHAWNEE- MARTIN, KY 161KV SWITCHING STATION
Requested (queue) date2025-07-23
Proposed in-service date2030-09-15
Operational date
Withdrawn date
Developer
Utility / transmission ownerTennessee Valley Authority

Cross-source records

This project is also observed in: Lawrence Berkeley National Laboratory — Queued Up interconnection dataset. interXdata links these source records without double-counting the project.

What changed

ObservedFieldOld valueNew valueMateriality
2026-08-03new_projectactivehigh

Explore related data

Source last checked2026-08-24
Data last materially changed2026-08-24
Page data generated2026-08-27

Provenance: tva-oasis. Values are normalized from public source records into the interXdata canonical warehouse; see each source for original filings.

Follow this project and get an alert when its status, capacity, developer, or schedule changes.

Start tracking with interXdata