KY Queue Project 609 — Solar in McCracken, Kentucky

KY Queue Project 609 — Solar in McCracken, Kentucky is a 96.0 MW solar interconnection project in McCracken, Kentucky with a current status of active. It is proposed to connect at Shawnee 161-kV Substation.

96.0 MWCapacity
ActiveStatus
KYMarket
SolarTechnology

Project facts

Canonical nameKY Queue Project 609 — Solar in McCracken, Kentucky
Queue ID609
Statusactive
Source statusE&P Agreement
MarketKY
TechnologySolar
Capacity96.0 MW
StateKentucky
CountyMcCracken
Point of interconnectionShawnee 161-kV Substation
Requested (queue) date2024-02-26
Proposed in-service date2025-10-15
Operational date
Withdrawn date
Developer
Utility / transmission ownerTennessee Valley Authority

Cross-source records

This project is also observed in: Lawrence Berkeley National Laboratory — Queued Up interconnection dataset. interXdata links these source records without double-counting the project.

What changed

ObservedFieldOld valueNew valueMateriality
2026-08-24poi_nameShawnee 161kV BussShawnee 161-kV Substationlow
2026-08-03new_projectactivehigh

Explore related data

Source last checked2026-08-24
Data last materially changed2026-08-24
Page data generated2026-08-27

Provenance: tva-oasis. Values are normalized from public source records into the interXdata canonical warehouse; see each source for original filings.

Follow this project and get an alert when its status, capacity, developer, or schedule changes.

Start tracking with interXdata