KY Queue Project AC2026-005 — Solar in Logan, Kentucky
KY Queue Project AC2026-005 — Solar in Logan, Kentucky is a 135.0 MW solar interconnection project in Logan, Kentucky with a current status of active. It is proposed to connect at Cave Springs 161kV Switching Station.
135.0 MWCapacity
ActiveStatus
KYMarket
SolarTechnology
Project facts
| Canonical name | KY Queue Project AC2026-005 — Solar in Logan, Kentucky |
|---|---|
| Queue ID | AC2026-005 |
| Status | active |
| Source status | Deficiency Check |
| Market | KY |
| Technology | Solar |
| Capacity | 135.0 MW |
| State | Kentucky |
| County | Logan |
| Point of interconnection | Cave Springs 161kV Switching Station |
| Requested (queue) date | 2026-02-17 |
| Proposed in-service date | 2029-06-01 |
| Operational date | — |
| Withdrawn date | — |
| Developer | — |
| Utility / transmission owner | Tennessee Valley Authority |
What changed
| Observed | Field | Old value | New value | Materiality |
|---|---|---|---|---|
| 2026-08-03 | new_project | — | active | high |
Explore related data
Source last checked2026-08-24
Data last materially changed2026-08-24
Page data generated2026-08-28
Provenance: tva-oasis. Values are normalized from public source records into the interXdata canonical warehouse; see each source for original filings.
Follow this project and get an alert when its status, capacity, developer, or schedule changes.