KY Queue Project LGE-GIS-2017-006 — Solar in Muhlenberg County, Kentucky

KY Queue Project LGE-GIS-2017-006 — Solar in Muhlenberg County, Kentucky is a 100.0 MW solar interconnection project in Muhlenberg County, Kentucky with a current status of withdrawn. It is proposed to connect at 138 kV Green River substation (Alternate POI: Green River - Green River Tap 138 kV).

100.0 MWCapacity
WithdrawnStatus
KYMarket
SolarTechnology

Project facts

Canonical nameKY Queue Project LGE-GIS-2017-006 — Solar in Muhlenberg County, Kentucky
Queue IDLGE-GIS-2017-006
Statuswithdrawn
Source statusLGIA terminated
MarketKY
TechnologySolar
Capacity100.0 MW
StateKentucky
CountyMuhlenberg County
Point of interconnection138 kV Green River substation (Alternate POI: Green River - Green River Tap 138 kV)
Requested (queue) date2017-08-18
Proposed in-service date2019-12-31
Operational date
Withdrawn date
Developer
Utility / transmission ownerLouisville Gas & Electric and Kentucky Utilities Energy

Cross-source records

This project is also observed in: Lawrence Berkeley National Laboratory — Queued Up interconnection dataset. interXdata links these source records without double-counting the project.

What changed

ObservedFieldOld valueNew valueMateriality
2026-08-04new_projectwithdrawnhigh

Explore related data

Source last checked2026-08-04
Data last materially changed2026-08-04
Page data generated2026-08-28

Provenance: lgeku-oasis. Values are normalized from public source records into the interXdata canonical warehouse; see each source for original filings.

Follow this project and get an alert when its status, capacity, developer, or schedule changes.

Start tracking with interXdata