KY Queue Project LGE-GIS-2018-003 — Solar in Hart County, Kentucky

KY Queue Project LGE-GIS-2018-003 — Solar in Hart County, Kentucky is a 120.0 MW solar interconnection project in Hart County, Kentucky with a current status of withdrawn. It is proposed to connect at Bonneville - West Lebanon 138 kV line.

120.0 MWCapacity
WithdrawnStatus
KYMarket
SolarTechnology

Project facts

Canonical nameKY Queue Project LGE-GIS-2018-003 — Solar in Hart County, Kentucky
Queue IDLGE-GIS-2018-003
Statuswithdrawn
Source statusWithdrawn
MarketKY
TechnologySolar
Capacity120.0 MW
StateKentucky
CountyHart County
Point of interconnectionBonneville - West Lebanon 138 kV line
Requested (queue) date2018-10-01
Proposed in-service date2022-06-01
Operational date
Withdrawn date
Developer
Utility / transmission ownerLouisville Gas & Electric and Kentucky Utilities Energy

Cross-source records

This project is also observed in: Lawrence Berkeley National Laboratory — Queued Up interconnection dataset. interXdata links these source records without double-counting the project.

What changed

ObservedFieldOld valueNew valueMateriality
2026-08-04new_projectwithdrawnhigh

Explore related data

Source last checked2026-08-04
Data last materially changed2026-08-04
Page data generated2026-08-27

Provenance: lgeku-oasis. Values are normalized from public source records into the interXdata canonical warehouse; see each source for original filings.

Follow this project and get an alert when its status, capacity, developer, or schedule changes.

Start tracking with interXdata