KY Queue Project LGE-GIS-2019-012 — Solar in Muhlenberg County, Kentucky

KY Queue Project LGE-GIS-2019-012 — Solar in Muhlenberg County, Kentucky is a 100.0 MW solar interconnection project in Muhlenberg County, Kentucky with a current status of withdrawn. It is proposed to connect at Green River Substation or Green River to Tap 161 kV.

100.0 MWCapacity
WithdrawnStatus
KYMarket
SolarTechnology

Project facts

Canonical nameKY Queue Project LGE-GIS-2019-012 — Solar in Muhlenberg County, Kentucky
Queue IDLGE-GIS-2019-012
Statuswithdrawn
Source statusWithdrawn
MarketKY
TechnologySolar
Capacity100.0 MW
StateKentucky
CountyMuhlenberg County
Point of interconnectionGreen River Substation or Green River to Tap 161 kV
Requested (queue) date2019-03-22
Proposed in-service date2021-12-31
Operational date
Withdrawn date
Developer
Utility / transmission ownerLouisville Gas & Electric and Kentucky Utilities Energy

Cross-source records

This project is also observed in: Lawrence Berkeley National Laboratory — Queued Up interconnection dataset. interXdata links these source records without double-counting the project.

What changed

ObservedFieldOld valueNew valueMateriality
2026-08-04new_projectwithdrawnhigh

Explore related data

Source last checked2026-08-04
Data last materially changed2026-08-04
Page data generated2026-08-27

Provenance: lgeku-oasis. Values are normalized from public source records into the interXdata canonical warehouse; see each source for original filings.

Follow this project and get an alert when its status, capacity, developer, or schedule changes.

Start tracking with interXdata