KY Queue Project LGE-GIS-2023-007 — Solar in Hopkins County, Kentucky
KY Queue Project LGE-GIS-2023-007 — Solar in Hopkins County, Kentucky is a 138.0 MW solar interconnection project in Hopkins County, Kentucky with a current status of active. It is proposed to connect at 161kV Earlington North Substation.
138.0 MWCapacity
ActiveStatus
KYMarket
SolarTechnology
Project facts
| Canonical name | KY Queue Project LGE-GIS-2023-007 — Solar in Hopkins County, Kentucky |
|---|---|
| Queue ID | LGE-GIS-2023-007 |
| Status | active |
| Source status | LGIA Signed |
| Market | KY |
| Technology | Solar |
| Capacity | 138.0 MW |
| State | Kentucky |
| County | Hopkins County |
| Point of interconnection | 161kV Earlington North Substation |
| Requested (queue) date | 2023-08-21 |
| Proposed in-service date | 2026-12-12 |
| Operational date | — |
| Withdrawn date | — |
| Developer | — |
| Utility / transmission owner | Louisville Gas & Electric and Kentucky Utilities Energy |
Cross-source records
This project is also observed in: Lawrence Berkeley National Laboratory — Queued Up interconnection dataset. interXdata links these source records without double-counting the project.
What changed
| Observed | Field | Old value | New value | Materiality |
|---|---|---|---|---|
| 2026-08-04 | new_project | — | active | high |
Explore related data
Source last checked2026-08-04
Data last materially changed2026-08-04
Page data generated2026-08-27
Provenance: lgeku-oasis. Values are normalized from public source records into the interXdata canonical warehouse; see each source for original filings.
Follow this project and get an alert when its status, capacity, developer, or schedule changes.
Start tracking with interXdata