L (116724)

L is a 74.5 MW solar interconnection project in Gilchrist, Florida with a current status of active. It is proposed to connect at Hayfield Substation.

74.5 MWCapacity
ActiveStatus
FLMarket
SolarTechnology

Project facts

Canonical nameL
Queue ID116724
Statusactive
Source statusin g mm ae tr erc i Da el lO lp ape er ra dat tio ion -
MarketFL
TechnologySolar
Capacity74.5 MW
StateFlorida
CountyGilchrist
Point of interconnectionHayfield Substation
Requested (queue) date2020-06-02
Proposed in-service date2023-12-01
Operational date
Withdrawn date
DeveloperL.P. Daniel
Utility / transmission ownerDuke Energy Progress

What changed

ObservedFieldOld valueNew valueMateriality
2026-08-04new_projectactivehigh

Explore related data

Source last checked2026-08-04
Data last materially changed2026-08-04
Page data generated2026-08-27

Provenance: duke-def-oasis. Values are normalized from public source records into the interXdata canonical warehouse; see each source for original filings.

Follow this project and get an alert when its status, capacity, developer, or schedule changes.

Start tracking with interXdata