L0397 Clatskanie PUD Allston (L0397)
L0397 Clatskanie PUD Allston is a 250.0 MW other interconnection project in Columbia, Oregon with a current status of withdrawn. It is proposed to connect at BPA's Allston Substation.
250.0 MWCapacity
WithdrawnStatus
ORMarket
OtherTechnology
Project facts
| Canonical name | L0397 Clatskanie PUD Allston |
|---|---|
| Queue ID | L0397 |
| Status | withdrawn |
| Source status | WITHDRAWN |
| Market | OR |
| Technology | Other |
| Capacity | 250.0 MW |
| State | Oregon |
| County | Columbia |
| Point of interconnection | BPA's Allston Substation |
| Requested (queue) date | 2016-03-04 |
| Proposed in-service date | 2020-01-01 |
| Operational date | — |
| Withdrawn date | — |
| Developer | Clatskanie People's Utility District |
| Utility / transmission owner | Bonneville Power Administration |
What changed
| Observed | Field | Old value | New value | Materiality |
|---|---|---|---|---|
| 2026-08-04 | new_project | — | withdrawn | high |
Explore related data
Source last checked2026-08-04
Data last materially changed2026-08-04
Page data generated2026-08-27
Provenance: bpa-oasis. Values are normalized from public source records into the interXdata canonical warehouse; see each source for original filings.
Follow this project and get an alert when its status, capacity, developer, or schedule changes.
Start tracking with interXdata