La Casa Wind (21INR0240)

La Casa Wind is a 148.4 MW other interconnection project in Stephens, Texas with a current status of operational. It is proposed to connect at New switching station: 138kV Graham Plant Switch - Breckenridge - Leon Switch .

148.4 MWCapacity
OperationalStatus
StephensMarket
OtherTechnology

Project facts

Canonical nameLa Casa Wind
Queue ID21INR0240
Statusoperational
Source statusSS Completed, FIS Completed, IA
MarketStephens
TechnologyOther
Capacity148.4 MW
StateTexas
CountyStephens
Point of interconnectionNew switching station: 138kV Graham Plant Switch - Breckenridge - Leon Switch
Requested (queue) date2018-12-28
Proposed in-service date
Operational date2026-08-15
Withdrawn date
DeveloperLA CASA WIND, LLC
Utility / transmission ownerERCOT

Cross-source records

This project is also observed in: Lawrence Berkeley National Laboratory — Queued Up interconnection dataset. interXdata links these source records without double-counting the project.

What changed

ObservedFieldOld valueNew valueMateriality
2026-07-31new_projectoperationalhigh

Explore related data

Source last checked2026-08-01
Data last materially changed2026-08-01
Page data generated2026-08-27

Provenance: ERCOT — Generation Interconnection Status (GIS) report. Values are normalized from public source records into the interXdata canonical warehouse; see each source for original filings.

Follow this project and get an alert when its status, capacity, developer, or schedule changes.

Start tracking with interXdata