Lafayette to Middlefork 69kV Line (Circuit 6909) (J2779)

Lafayette to Middlefork 69kV Line (Circuit 6909) is a 40.0 MW solar interconnection project in Clinton, Indiana with a current status of withdrawn. It is proposed to connect at Lafayette to Middlefork 69kV Line (Circuit 6909).

40.0 MWCapacity
WithdrawnStatus
Market
SolarTechnology

Project facts

Canonical nameLafayette to Middlefork 69kV Line (Circuit 6909)
Queue IDJ2779
Statuswithdrawn
Source statusWithdrawn
Market
TechnologySolar
Capacity40.0 MW
StateIndiana
CountyClinton
Point of interconnectionLafayette to Middlefork 69kV Line (Circuit 6909)
Requested (queue) date2022-09-08
Proposed in-service date2025-01-01
Operational date2025-01-01
Withdrawn date2025-10-27
Developer
Utility / transmission ownerDuke Energy Progress

Cross-source records

This project is also observed in: Lawrence Berkeley National Laboratory — Queued Up interconnection dataset. interXdata links these source records without double-counting the project.

What changed

ObservedFieldOld valueNew valueMateriality
2026-07-29new_projectwithdrawnhigh

Explore related data

Source last checked2026-08-27
Data last materially changed2026-08-27
Page data generated2026-08-27

Provenance: MISO — generator interconnection queue. Values are normalized from public source records into the interXdata canonical warehouse; see each source for original filings.

Follow this project and get an alert when its status, capacity, developer, or schedule changes.

Start tracking with interXdata