Lafayette - Veedsburg West - Attica 230kV Line is a 300.0 MW wind interconnection project in Fountain County,Montgomery County,Tippecanoe County, Indiana with a current status of withdrawn. It is proposed to connect at Lafayette - Veedsburg West - Attica 230kV Line.

300.0 MWCapacity
WithdrawnStatus
Market
WindTechnology

Project facts

Canonical nameLafayette - Veedsburg West - Attica 230kV Line
Queue IDJ827
Statuswithdrawn
Source statusWithdrawn
Market
TechnologyWind
Capacity300.0 MW
StateIndiana
CountyFountain County,Montgomery County,Tippecanoe County
Point of interconnectionLafayette - Veedsburg West - Attica 230kV Line
Requested (queue) date2017-06-16
Proposed in-service date2020-09-30
Operational date2020-09-30
Withdrawn date2019-01-08
Developer
Utility / transmission ownerDuke Energy Progress

Cross-source records

This project is also observed in: Lawrence Berkeley National Laboratory — Queued Up interconnection dataset. interXdata links these source records without double-counting the project.

What changed

ObservedFieldOld valueNew valueMateriality
2026-07-29new_projectwithdrawnhigh

Explore related data

Source last checked2026-08-27
Data last materially changed2026-08-27
Page data generated2026-08-27

Provenance: MISO — generator interconnection queue. Values are normalized from public source records into the interXdata canonical warehouse; see each source for original filings.

Follow this project and get an alert when its status, capacity, developer, or schedule changes.

Start tracking with interXdata