Lake - 270888 345kV (AI2-023)

Lake - 270888 345kV is a 200.0 MW battery interconnection project in Lake, Indiana with a current status of withdrawn.

200.0 MWCapacity
WithdrawnStatus
Market
BatteryTechnology

Project facts

Canonical nameLake - 270888 345kV
Queue IDAI2-023
Statuswithdrawn
Source statusWithdrawn
Market
TechnologyBattery
Capacity200.0 MW
StateIndiana
CountyLake
Point of interconnection
Requested (queue) date2022-12-20
Proposed in-service date2028-12-31
Operational date
Withdrawn date2025-01-15
Developer
Utility / transmission ownerComEd

Cross-source records

This project is also observed in: Lawrence Berkeley National Laboratory — Queued Up interconnection dataset. interXdata links these source records without double-counting the project.

What changed

ObservedFieldOld valueNew valueMateriality
2026-07-29new_projectwithdrawnhigh

Explore related data

Source last checked2026-08-27
Data last materially changed2026-08-27
Page data generated2026-08-27

Provenance: PJM — new-services interconnection queue. Values are normalized from public source records into the interXdata canonical warehouse; see each source for original filings.

Follow this project and get an alert when its status, capacity, developer, or schedule changes.

Start tracking with interXdata