LAKE CLEMENTINE HYDROELECTRIC (962)

LAKE CLEMENTINE HYDROELECTRIC is a 15.5 MW other interconnection project in Placer, California with a current status of withdrawn. It is proposed to connect at Halsey Substation 60Kv.

15.5 MWCapacity
WithdrawnStatus
Market
OtherTechnology

Project facts

Canonical nameLAKE CLEMENTINE HYDROELECTRIC
Queue ID962
Statuswithdrawn
Source statusWITHDRAWN
Market
TechnologyOther
Capacity15.5 MW
StateCalifornia
CountyPlacer
Point of interconnectionHalsey Substation 60Kv
Requested (queue) date2013-04-30
Proposed in-service date
Operational date
Withdrawn date2014-04-25
Developer
Utility / transmission ownerPGAE

Cross-source records

This project is also observed in: Lawrence Berkeley National Laboratory — Queued Up interconnection dataset. interXdata links these source records without double-counting the project.

What changed

ObservedFieldOld valueNew valueMateriality
2026-07-29new_projectwithdrawnhigh

Explore related data

Source last checked2026-08-27
Data last materially changed2026-08-27
Page data generated2026-08-27

Provenance: California ISO — public interconnection queue. Values are normalized from public source records into the interXdata canonical warehouse; see each source for original filings.