Lake County - Pere Marquette (METC) 138.0kV (J2668)

Lake County - Pere Marquette (METC) 138.0kV is a 215.0 MW solar interconnection project in Mason, Michigan with a current status of operational. It is proposed to connect at Lake County - Pere Marquette (METC) 138.0kV.

215.0 MWCapacity
OperationalStatus
Market
SolarTechnology

Project facts

Canonical nameLake County - Pere Marquette (METC) 138.0kV
Queue IDJ2668
Statusoperational
Source statusPending Revision Approval
Market
TechnologySolar
Capacity215.0 MW
StateMichigan
CountyMason
Point of interconnectionLake County - Pere Marquette (METC) 138.0kV
Requested (queue) date2022-09-14
Proposed in-service date2025-11-01
Operational date2025-11-01
Withdrawn date
Developer
Utility / transmission ownerWOLVERINE POWER SUPPLY COOPERATIVE

Cross-source records

This project is also observed in: Lawrence Berkeley National Laboratory — Queued Up interconnection dataset. interXdata links these source records without double-counting the project.

What changed

ObservedFieldOld valueNew valueMateriality
2026-07-29new_projectoperationalhigh

Explore related data

Source last checked2026-08-27
Data last materially changed2026-08-27
Page data generated2026-08-27

Provenance: MISO — generator interconnection queue. Values are normalized from public source records into the interXdata canonical warehouse; see each source for original filings.

Follow this project and get an alert when its status, capacity, developer, or schedule changes.

Start tracking with interXdata