Lake Road CNR Only (see Q534) (604)

Lake Road CNR Only (see Q534) is a 882.0 MW gas interconnection project in Windham, Connecticut with a current status of operational. It is proposed to connect at 345kV Lake Road 27E Substation.

882.0 MWCapacity
OperationalStatus
RIMarket
GasTechnology

Project facts

Canonical nameLake Road CNR Only (see Q534)
Queue ID604
Statusoperational
Source statusC
MarketRI
TechnologyGas
Capacity882.0 MW
StateConnecticut
CountyWindham
Point of interconnection345kV Lake Road 27E Substation
Requested (queue) date2016-04-20
Proposed in-service date
Operational date2018-05-20
Withdrawn date
Developer
Utility / transmission ownerISO-NE

What changed

ObservedFieldOld valueNew valueMateriality
2026-08-04new_projectoperationalhigh

Explore related data

Source last checked2026-08-04
Data last materially changed2026-08-04
Page data generated2026-08-27

Provenance: isone-irtt. Values are normalized from public source records into the interXdata canonical warehouse; see each source for original filings.