Lakefield Junction - Huntley 345 kV line (Tap) (J785)

Lakefield Junction - Huntley 345 kV line (Tap) is a 105.0 MW wind interconnection project in Jackson County,Martin County, Minnesota with a current status of withdrawn. It is proposed to connect at Lakefield Junction - Huntley 345 kV line (Tap).

105.0 MWCapacity
WithdrawnStatus
Market
WindTechnology

Project facts

Canonical nameLakefield Junction - Huntley 345 kV line (Tap)
Queue IDJ785
Statuswithdrawn
Source statusWithdrawn
Market
TechnologyWind
Capacity105.0 MW
StateMinnesota
CountyJackson County,Martin County
Point of interconnectionLakefield Junction - Huntley 345 kV line (Tap)
Requested (queue) date2017-06-16
Proposed in-service date2021-09-15
Operational date2021-09-15
Withdrawn date2021-01-29
Developer
Utility / transmission ownerITC MIDWEST

Cross-source records

This project is also observed in: Lawrence Berkeley National Laboratory — Queued Up interconnection dataset. interXdata links these source records without double-counting the project.

What changed

ObservedFieldOld valueNew valueMateriality
2026-07-29new_projectwithdrawnhigh

Explore related data

Source last checked2026-08-27
Data last materially changed2026-08-27
Page data generated2026-08-27

Provenance: MISO — generator interconnection queue. Values are normalized from public source records into the interXdata canonical warehouse; see each source for original filings.

Follow this project and get an alert when its status, capacity, developer, or schedule changes.

Start tracking with interXdata