Lakeland Electric Co. (FL)-Airport 1 (59744_1)

Lakeland Electric Co. (FL)-Airport 1 is a 2.3 MW solar interconnection project in Polk, Florida with a current status of operational.

2.3 MWCapacity
OperationalStatus
TECMarket
SolarTechnology

Project facts

Canonical nameLakeland Electric Co. (FL)-Airport 1
Queue ID59744_1
Statusoperational
Source status(OP) Operating
MarketTEC
TechnologySolar
Capacity2.3 MW
StateFlorida
CountyPolk
Point of interconnection
Requested (queue) date
Proposed in-service date
Operational date2011-12-01
Withdrawn date
Developer
Utility / transmission ownerSunE W12DG-B, LLC

What changed

ObservedFieldOld valueNew valueMateriality
2026-08-02new_projectoperationalhigh

Explore related data

Source last checked2026-08-03
Data last materially changed2026-08-03
Page data generated2026-08-28

Provenance: U.S. EIA — Form EIA-860M generator inventory (operating + planned). Values are normalized from public source records into the interXdata canonical warehouse; see each source for original filings.

Follow this project and get an alert when its status, capacity, developer, or schedule changes.

Start tracking with interXdata