Landcaster - Pecatonica 138 kV (AI1-191)

Landcaster - Pecatonica 138 kV is a 200.0 MW wind interconnection project in Stephenson, Illinois with a current status of withdrawn.

200.0 MWCapacity
WithdrawnStatus
Market
WindTechnology

Project facts

Canonical nameLandcaster - Pecatonica 138 kV
Queue IDAI1-191
Statuswithdrawn
Source statusWithdrawn
Market
TechnologyWind
Capacity200.0 MW
StateIllinois
CountyStephenson
Point of interconnection
Requested (queue) date2022-09-09
Proposed in-service date2027-12-01
Operational date
Withdrawn date
Developer
Utility / transmission ownerComEd

Cross-source records

This project is also observed in: Lawrence Berkeley National Laboratory — Queued Up interconnection dataset. interXdata links these source records without double-counting the project.

What changed

ObservedFieldOld valueNew valueMateriality
2026-07-29new_projectwithdrawnhigh

Explore related data

Source last checked2026-08-27
Data last materially changed2026-08-27
Page data generated2026-08-27

Provenance: PJM — new-services interconnection queue. Values are normalized from public source records into the interXdata canonical warehouse; see each source for original filings.

Follow this project and get an alert when its status, capacity, developer, or schedule changes.

Start tracking with interXdata