Larrabee 230 kV IV (AH1-557)
Larrabee 230 kV IV is a 1,300.0 MW offshore wind interconnection project in Monmouth, New Jersey with a current status of withdrawn. It is proposed to connect at Larrabee Collector Station 230 kV.
1,300.0 MWCapacity
WithdrawnStatus
PJMMarket
Offshore WindTechnology
Project facts
| Canonical name | Larrabee 230 kV IV |
|---|---|
| Queue ID | AH1-557 |
| Status | withdrawn |
| Source status | withdrawn |
| Market | PJM |
| Technology | Offshore Wind |
| Capacity | 1,300.0 MW |
| State | New Jersey |
| County | Monmouth |
| Point of interconnection | Larrabee Collector Station 230 kV |
| Requested (queue) date | 2021-09-10 |
| Proposed in-service date | 2029-10-31 |
| Operational date | — |
| Withdrawn date | 2025-02-14 |
| Developer | Atlantic Wind, LLC |
| Utility / transmission owner | JCPL |
What changed
No material field-level changes have been recorded for this project since the baseline snapshot. interXdata detects changes as new source snapshots are ingested and diffed against prior state.
Explore related data
Source last checked2026-07-31
Data last materially changed2026-07-31
Page data generated2026-08-27
Provenance: Lawrence Berkeley National Laboratory — Queued Up interconnection dataset. Values are normalized from public source records into the interXdata canonical warehouse; see each source for original filings.
Follow this project and get an alert when its status, capacity, developer, or schedule changes.
Start tracking with interXdata