LAS CAMAS 2 (1383)

LAS CAMAS 2 is a 101.4 MW solar interconnection project in Merced, California with a current status of withdrawn. It is proposed to connect at Los Banos Substation 230kV.

101.4 MWCapacity
WithdrawnStatus
Market
SolarTechnology

Project facts

Canonical nameLAS CAMAS 2
Queue ID1383
Statuswithdrawn
Source statusWITHDRAWN
Market
TechnologySolar
Capacity101.4 MW
StateCalifornia
CountyMerced
Point of interconnectionLos Banos Substation 230kV
Requested (queue) date2017-05-01
Proposed in-service date
Operational date
Withdrawn date2018-04-18
Developer
Utility / transmission ownerPGAE

Cross-source records

This project is also observed in: Lawrence Berkeley National Laboratory — Queued Up interconnection dataset. interXdata links these source records without double-counting the project.

What changed

ObservedFieldOld valueNew valueMateriality
2026-07-29new_projectwithdrawnhigh

Explore related data

Source last checked2026-08-27
Data last materially changed2026-08-27
Page data generated2026-08-27

Provenance: California ISO — public interconnection queue. Values are normalized from public source records into the interXdata canonical warehouse; see each source for original filings.

Follow this project and get an alert when its status, capacity, developer, or schedule changes.

Start tracking with interXdata