LASALLE SOLAR PROJECT (1001)

LASALLE SOLAR PROJECT is a 20.0 MW solar interconnection project in Kings, California with a current status of withdrawn. It is proposed to connect at Henreitta-GWF 115kV Line.

20.0 MWCapacity
WithdrawnStatus
Market
SolarTechnology

Project facts

Canonical nameLASALLE SOLAR PROJECT
Queue ID1001
Statuswithdrawn
Source statusWITHDRAWN
Market
TechnologySolar
Capacity20.0 MW
StateCalifornia
CountyKings
Point of interconnectionHenreitta-GWF 115kV Line
Requested (queue) date2013-04-30
Proposed in-service date
Operational date
Withdrawn date2014-02-27
Developer
Utility / transmission ownerPGAE

Cross-source records

This project is also observed in: Lawrence Berkeley National Laboratory — Queued Up interconnection dataset. interXdata links these source records without double-counting the project.

What changed

ObservedFieldOld valueNew valueMateriality
2026-07-29new_projectwithdrawnhigh

Explore related data

Source last checked2026-08-27
Data last materially changed2026-08-27
Page data generated2026-08-27

Provenance: California ISO — public interconnection queue. Values are normalized from public source records into the interXdata canonical warehouse; see each source for original filings.

Follow this project and get an alert when its status, capacity, developer, or schedule changes.

Start tracking with interXdata