Lavender Storage Project (23INR0467)

Lavender Storage Project is a 231.9 MW other interconnection project in Bexar, Texas with a current status of operational. It is proposed to connect at Tap 138kV Deely (bus 5110) - Laredo (bus 5255).

231.9 MWCapacity
OperationalStatus
BexarMarket
OtherTechnology

Project facts

Canonical nameLavender Storage Project
Queue ID23INR0467
Statusoperational
Source statusSS Completed, FIS Started, IA
MarketBexar
TechnologyOther
Capacity231.9 MW
StateTexas
CountyBexar
Point of interconnectionTap 138kV Deely (bus 5110) - Laredo (bus 5255)
Requested (queue) date2022-02-28
Proposed in-service date
Operational date2029-09-13
Withdrawn date
DeveloperLavender Storage Project LLC
Utility / transmission ownerERCOT

Cross-source records

This project is also observed in: Lawrence Berkeley National Laboratory — Queued Up interconnection dataset. interXdata links these source records without double-counting the project.

What changed

ObservedFieldOld valueNew valueMateriality
2026-07-31new_projectoperationalhigh

Explore related data

Source last checked2026-08-01
Data last materially changed2026-08-01
Page data generated2026-08-27

Provenance: ERCOT — Generation Interconnection Status (GIS) report. Values are normalized from public source records into the interXdata canonical warehouse; see each source for original filings.