Lawton East Side-Sunnyside (Terry Road) 345kV (GEN-2015-092)

Lawton East Side-Sunnyside (Terry Road) 345kV is a 250.0 MW wind interconnection project in Grady, Oklahoma with a current status of withdrawn. It is proposed to connect at Lawton East Side-Sunnyside (Terry Road) 345kV.

250.0 MWCapacity
WithdrawnStatus
OKMarket
WindTechnology

Project facts

Canonical nameLawton East Side-Sunnyside (Terry Road) 345kV
Queue IDGEN-2015-092
Statuswithdrawn
Source statusWITHDRAWN
MarketOK
TechnologyWind
Capacity250.0 MW
StateOklahoma
CountyGrady
Point of interconnectionLawton East Side-Sunnyside (Terry Road) 345kV
Requested (queue) date2015-09-30
Proposed in-service date2020-12-31
Operational date
Withdrawn date2024-02-13
Developer
Utility / transmission ownerAEP

Cross-source records

This project is also observed in: Lawrence Berkeley National Laboratory — Queued Up interconnection dataset. interXdata links these source records without double-counting the project.

What changed

ObservedFieldOld valueNew valueMateriality
2026-07-31new_projectwithdrawnhigh

Explore related data

Source last checked2026-08-27
Data last materially changed2026-08-27
Page data generated2026-08-27

Provenance: Southwest Power Pool — generator interconnection queue. Values are normalized from public source records into the interXdata canonical warehouse; see each source for original filings.

Follow this project and get an alert when its status, capacity, developer, or schedule changes.

Start tracking with interXdata