Grady County, Oklahoma — Interconnection Projects
The interXdata warehouse tracks 21 interconnection projects in Grady, Oklahoma, representing 3,266 MW of requested capacity.
21Total projects
6Active
11Operational
4Withdrawn
3,266 MWRequested capacity
Technology mix
| Technology | Projects | Requested capacity |
|---|---|---|
| Wind | 10 | 1,474 MW |
| Solar | 7 | 1,276 MW |
| Battery | 4 | 515 MW |
Projects
| Project | Queue ID | Technology | Capacity | Status | Location |
|---|---|---|---|---|---|
| Terry Road 345kV station (shared with Rush Springs Windfarm on a common gentie) | GEN-2018-055 | Solar | 252.0 MW | active | Grady, Oklahoma |
| Minco 345kV | GEN-2017-150 | Solar | 250.0 MW | active | Grady, Oklahoma |
| Lawton Sub 345 kV | GEN-2013-037 | Wind | 250.0 MW | withdrawn | Grady, Oklahoma |
| Cornville 138 kV Substation | GEN-2024-369 | Battery | 250.0 MW | withdrawn | Grady, Oklahoma |
| Lawton East Side-Sunnyside (Terry Road) 345kV | GEN-2015-092 | Wind | 250.0 MW | withdrawn | Grady, Oklahoma |
| Rumble Solar | 69968_RUS | Solar | 250.0 MW | active | Grady, Oklahoma |
| Lawton East Side-Sunnyside (Terry Road) 345kV | GEN-2014-057 | Wind | 249.9 MW | operational | Grady, Oklahoma |
| Minco 345kV | GEN-2017-233 | Wind | 215.0 MW | active | Grady, Oklahoma |
| Sunshine North to Anadarko 138 kV | GEN-2022-055 | Solar | 200.0 MW | active | Grady, Oklahoma |
| Cleveland - Amber Tap 138 kV Line | GEN-2023-035 | Solar | 200.0 MW | active | Grady, Oklahoma |
| Minco 345 kV Substation | GEN-2024-172 | Battery | 190.0 MW | withdrawn | Grady, Oklahoma |
| Leonard 138 kV Substation | GEN-2024-362 | Solar | 120.0 MW | operational | Grady, Oklahoma |
| Drift Sand Wind Project LLC | 59065_WT1 | Wind | 108.0 MW | operational | Grady, Oklahoma |
| Minco Wind II, LLC | 57956_1 | Wind | 100.8 MW | operational | Grady, Oklahoma |
| Tuttle 138kV | GEN-2014-020 | Wind | 100.0 MW | operational | Grady, Oklahoma |
| Minco Wind I, LLC | 57590_1 | Wind | 99.2 MW | operational | Grady, Oklahoma |
| Redbed Plains Wind Farm | 61221_WT1 | Wind | 99.1 MW | operational | Grady, Oklahoma |
| Minco II Energy Storage | 68802_MINS2 | Battery | 65.0 MW | operational | Grady, Oklahoma |
| Rush Springs Energy Storage (BA) | 63458_RUSHE | Battery | 10.0 MW | operational | Grady, Oklahoma |
| Tuttle | 61618_1 | Solar | 4.0 MW | operational | Grady, Oklahoma |
| Minco 345kV | GEN-2016-131 | Wind | 2.5 MW | operational | Grady, Oklahoma |
Top developers
Developer attribution is not yet resolved for this set.
Explore related data
Source last checked2026-07-31
Data last materially changed2026-08-27
Page data generated2026-08-27
Provenance: U.S. EIA — Form EIA-860M generator inventory (operating + planned); Southwest Power Pool — generator interconnection queue. Values are normalized from public source records into the interXdata canonical warehouse; see each source for original filings.