Leach to Newton Bulk 138 kV Line (J2629)

Leach to Newton Bulk 138 kV Line is a 175.0 MW solar interconnection project in Newton, Texas with a current status of operational. It is proposed to connect at Leach to Newton Bulk 138 kV Line.

175.0 MWCapacity
OperationalStatus
Market
SolarTechnology

Project facts

Canonical nameLeach to Newton Bulk 138 kV Line
Queue IDJ2629
Statusoperational
Source statusActive
Market
TechnologySolar
Capacity175.0 MW
StateTexas
CountyNewton
Point of interconnectionLeach to Newton Bulk 138 kV Line
Requested (queue) date2022-09-14
Proposed in-service date2026-09-30
Operational date2026-09-30
Withdrawn date
Developer
Utility / transmission ownerENTERGY ARKANSAS

Cross-source records

This project is also observed in: Lawrence Berkeley National Laboratory — Queued Up interconnection dataset. interXdata links these source records without double-counting the project.

What changed

ObservedFieldOld valueNew valueMateriality
2026-07-29new_projectoperationalhigh

Explore related data

Source last checked2026-08-27
Data last materially changed2026-08-27
Page data generated2026-08-27

Provenance: MISO — generator interconnection queue. Values are normalized from public source records into the interXdata canonical warehouse; see each source for original filings.

Follow this project and get an alert when its status, capacity, developer, or schedule changes.

Start tracking with interXdata