Leaf River Cellulose LLC (10233_GEN1)

Leaf River Cellulose LLC is a 25.2 MW other interconnection project in Perry, Mississippi with a current status of operational.

25.2 MWCapacity
OperationalStatus
SOCOMarket
OtherTechnology

Project facts

Canonical nameLeaf River Cellulose LLC
Queue ID10233_GEN1
Statusoperational
Source status(OP) Operating
MarketSOCO
TechnologyOther
Capacity25.2 MW
StateMississippi
CountyPerry
Point of interconnection
Requested (queue) date
Proposed in-service date
Operational date1984-07-01
Withdrawn date
Developer
Utility / transmission ownerLeaf River Cellulose LLC

What changed

ObservedFieldOld valueNew valueMateriality
2026-08-02new_projectoperationalhigh

Explore related data

Source last checked2026-08-03
Data last materially changed2026-08-03
Page data generated2026-08-27

Provenance: U.S. EIA — Form EIA-860M generator inventory (operating + planned). Values are normalized from public source records into the interXdata canonical warehouse; see each source for original filings.

Follow this project and get an alert when its status, capacity, developer, or schedule changes.

Start tracking with interXdata