Leaf River Wind (AE1-114)
Leaf River Wind is a 150.0 MW wind interconnection project in Ogle, Illinois with a current status of active. It is proposed to connect at Maryland-Lancaster 138 kV.
150.0 MWCapacity
ActiveStatus
PJMMarket
WindTechnology
Project facts
| Canonical name | Leaf River Wind |
|---|---|
| Queue ID | AE1-114 |
| Status | active |
| Source status | active |
| Market | PJM |
| Technology | Wind |
| Capacity | 150.0 MW |
| State | Illinois |
| County | Ogle |
| Point of interconnection | Maryland-Lancaster 138 kV |
| Requested (queue) date | 2018-09-13 |
| Proposed in-service date | 2021-12-31 |
| Operational date | — |
| Withdrawn date | — |
| Developer | Leaf River Wind, LLC |
| Utility / transmission owner | ComEd |
What changed
No material field-level changes have been recorded for this project since the baseline snapshot. interXdata detects changes as new source snapshots are ingested and diffed against prior state.
Explore related data
Source last checked2026-07-31
Data last materially changed2026-07-31
Page data generated2026-08-27
Provenance: Lawrence Berkeley National Laboratory — Queued Up interconnection dataset. Values are normalized from public source records into the interXdata canonical warehouse; see each source for original filings.
Follow this project and get an alert when its status, capacity, developer, or schedule changes.
Start tracking with interXdata