Leaning Juniper II A Wind Farm (G0917)

Leaning Juniper II A Wind Farm is a 91.0 MW wind interconnection project in Gilliam, Oregon with a current status of operational. It is proposed to connect at Jones Canyon Substation.

91.0 MWCapacity
OperationalStatus
ORMarket
WindTechnology

Project facts

Canonical nameLeaning Juniper II A Wind Farm
Queue IDG0917
Statusoperational
Source statusENERGIZED
MarketOR
TechnologyWind
Capacity91.0 MW
StateOregon
CountyGilliam
Point of interconnectionJones Canyon Substation
Requested (queue) date2023-08-02
Proposed in-service date
Operational date2025-09-02
Withdrawn date
DeveloperLeaning Juniper Wind Power II, LLC
Utility / transmission ownerBonneville Power Administration

Cross-source records

This project is also observed in: Lawrence Berkeley National Laboratory — Queued Up interconnection dataset. interXdata links these source records without double-counting the project.

What changed

ObservedFieldOld valueNew valueMateriality
2026-08-04new_projectoperationalhigh

Explore related data

Source last checked2026-08-04
Data last materially changed2026-08-04
Page data generated2026-08-28

Provenance: bpa-oasis. Values are normalized from public source records into the interXdata canonical warehouse; see each source for original filings.

Follow this project and get an alert when its status, capacity, developer, or schedule changes.

Start tracking with interXdata