Leaning Juniper II (G0226)

Leaning Juniper II is a 200.0 MW wind interconnection project in Gilliam, Oregon with a current status of operational. It is proposed to connect at Jones Canyon Substation.

200.0 MWCapacity
OperationalStatus
ORMarket
WindTechnology

Project facts

Canonical nameLeaning Juniper II
Queue IDG0226
Statusoperational
Source statusENERGIZED
MarketOR
TechnologyWind
Capacity200.0 MW
StateOregon
CountyGilliam
Point of interconnectionJones Canyon Substation
Requested (queue) date2006-05-24
Proposed in-service date
Operational date2009-06-01
Withdrawn date
DeveloperAvangrid Power, LLC
Utility / transmission ownerBonneville Power Administration

Cross-source records

This project is also observed in: Lawrence Berkeley National Laboratory — Queued Up interconnection dataset. interXdata links these source records without double-counting the project.

What changed

ObservedFieldOld valueNew valueMateriality
2026-08-04new_projectoperationalhigh

Explore related data

Source last checked2026-08-04
Data last materially changed2026-08-04
Page data generated2026-08-27

Provenance: bpa-oasis. Values are normalized from public source records into the interXdata canonical warehouse; see each source for original filings.

Follow this project and get an alert when its status, capacity, developer, or schedule changes.