Leaning Juniper Wind Power II (57333_1)

Leaning Juniper Wind Power II is a 199.2 MW wind interconnection project in Gilliam, Oregon with a current status of operational.

199.2 MWCapacity
OperationalStatus
AVRNMarket
WindTechnology

Project facts

Canonical nameLeaning Juniper Wind Power II
Queue ID57333_1
Statusoperational
Source status(OP) Operating
MarketAVRN
TechnologyWind
Capacity199.2 MW
StateOregon
CountyGilliam
Point of interconnection—
Requested (queue) date—
Proposed in-service date—
Operational date2011-03-01
Withdrawn date—
Developer—
Utility / transmission ownerAvangrid Power LLC

What changed

ObservedFieldOld valueNew valueMateriality
2026-08-02new_project—operationalhigh

Explore related data

Source last checked2026-10-02
Data last materially changed2026-10-02
Page data generated2026-10-12

Provenance: U.S. EIA — Form EIA-860M generator inventory (operating + planned). Values are normalized from public source records into the interXdata canonical warehouse; see each source for original filings.

Follow this project and get an alert when its status, capacity, developer, or schedule changes.

Start tracking with interXdata