Leaning Juniper Wind Power II (57333_1)

Leaning Juniper Wind Power II is a 199.2 MW wind interconnection project in Gilliam, Oregon with a current status of operational.

199.2 MWCapacity
OperationalStatus
AVRNMarket
WindTechnology

Project facts

Canonical nameLeaning Juniper Wind Power II
Queue ID57333_1
Statusoperational
Source status(OP) Operating
MarketAVRN
TechnologyWind
Capacity199.2 MW
StateOregon
CountyGilliam
Point of interconnection
Requested (queue) date
Proposed in-service date
Operational date2011-03-01
Withdrawn date
Developer
Utility / transmission ownerAvangrid Power LLC

What changed

ObservedFieldOld valueNew valueMateriality
2026-08-02new_projectoperationalhigh

Explore related data

Source last checked2026-08-03
Data last materially changed2026-08-03
Page data generated2026-08-27

Provenance: U.S. EIA — Form EIA-860M generator inventory (operating + planned). Values are normalized from public source records into the interXdata canonical warehouse; see each source for original filings.