Legato BESS (25INR0184)

Legato BESS is a 202.7 MW other interconnection project in Wise, Texas with a current status of operational. It is proposed to connect at 138kV #608 Crafton Substation - #620 Bowie Substation.

202.7 MWCapacity
OperationalStatus
WiseMarket
OtherTechnology

Project facts

Canonical nameLegato BESS
Queue ID25INR0184
Statusoperational
Source statusSS Completed, FIS Completed, No IA
MarketWise
TechnologyOther
Capacity202.7 MW
StateTexas
CountyWise
Point of interconnection138kV #608 Crafton Substation - #620 Bowie Substation
Requested (queue) date2022-09-27
Proposed in-service date
Operational date2028-04-24
Withdrawn date
DeveloperLegato Storage, LLC
Utility / transmission ownerERCOT

Cross-source records

This project is also observed in: Lawrence Berkeley National Laboratory — Queued Up interconnection dataset. interXdata links these source records without double-counting the project.

What changed

ObservedFieldOld valueNew valueMateriality
2026-07-31new_projectoperationalhigh

Explore related data

Source last checked2026-08-01
Data last materially changed2026-08-01
Page data generated2026-08-27

Provenance: ERCOT — Generation Interconnection Status (GIS) report. Values are normalized from public source records into the interXdata canonical warehouse; see each source for original filings.