Legoland CA Phase I (69734_10617)

Legoland CA Phase I is a 1.4 MW solar interconnection project in San Diego, California with a current status of operational.

1.4 MWCapacity
OperationalStatus
CISOMarket
SolarTechnology

Project facts

Canonical nameLegoland CA Phase I
Queue ID69734_10617
Statusoperational
Source status(OP) Operating
MarketCISO
TechnologySolar
Capacity1.4 MW
StateCalifornia
CountySan Diego
Point of interconnection
Requested (queue) date
Proposed in-service date
Operational date2025-06-01
Withdrawn date
Developer
Utility / transmission ownerOnyx Asset Services Group

What changed

ObservedFieldOld valueNew valueMateriality
2026-08-02new_projectoperationalhigh

Explore related data

Source last checked2026-08-03
Data last materially changed2026-08-03
Page data generated2026-08-27

Provenance: U.S. EIA — Form EIA-860M generator inventory (operating + planned). Values are normalized from public source records into the interXdata canonical warehouse; see each source for original filings.

Follow this project and get an alert when its status, capacity, developer, or schedule changes.

Start tracking with interXdata