Lemoyne 345 kV (AH1-711 - moved to TC2)
Lemoyne 345 kV is a 408.2 MW gas interconnection project in Wood, Ohio with a current status of active.
408.2 MWCapacity
ActiveStatus
—Market
GasTechnology
Project facts
| Canonical name | Lemoyne 345 kV |
|---|---|
| Queue ID | AH1-711 - moved to TC2 |
| Status | active |
| Source status | Active |
| Market | — |
| Technology | Gas |
| Capacity | 408.2 MW |
| State | Ohio |
| County | Wood |
| Point of interconnection | — |
| Requested (queue) date | 2025-04-09 |
| Proposed in-service date | 2030-05-31 |
| Operational date | — |
| Withdrawn date | — |
| Developer | — |
| Utility / transmission owner | ATSI |
What changed
| Observed | Field | Old value | New value | Materiality |
|---|---|---|---|---|
| 2026-07-29 | new_project | — | active | high |
Explore related data
Source last checked2026-08-27
Data last materially changed2026-08-27
Page data generated2026-08-27
Provenance: PJM — new-services interconnection queue. Values are normalized from public source records into the interXdata canonical warehouse; see each source for original filings.
Follow this project and get an alert when its status, capacity, developer, or schedule changes.
Start tracking with interXdata