Lenox 34kV is a 19.9 MW gas interconnection project in Lackawanna, Pennsylvania with a current status of withdrawn.

19.9 MWCapacity
WithdrawnStatus
Market
GasTechnology

Project facts

Canonical nameLenox 34kV
Queue IDZ1-091
Statuswithdrawn
Source statusWithdrawn
Market
TechnologyGas
Capacity19.9 MW
StatePennsylvania
CountyLackawanna
Point of interconnection
Requested (queue) date2013-10-31
Proposed in-service date2017-03-31
Operational date
Withdrawn date2018-12-15
Developer
Utility / transmission ownerPENELEC

Cross-source records

This project is also observed in: Lawrence Berkeley National Laboratory — Queued Up interconnection dataset. interXdata links these source records without double-counting the project.

What changed

ObservedFieldOld valueNew valueMateriality
2026-07-29new_projectwithdrawnhigh

Explore related data

Source last checked2026-08-27
Data last materially changed2026-08-27
Page data generated2026-08-27

Provenance: PJM — new-services interconnection queue. Values are normalized from public source records into the interXdata canonical warehouse; see each source for original filings.

Follow this project and get an alert when its status, capacity, developer, or schedule changes.

Start tracking with interXdata