Lewis Run - Pierce Brook 230 kV is a 240.0 MW solar interconnection project in McKean, Pennsylvania with a current status of withdrawn.
240.0 MWCapacity
WithdrawnStatus
—Market
SolarTechnology
Project facts
| Canonical name | Lewis Run - Pierce Brook 230 kV |
|---|---|
| Queue ID | AH1-588 - moved to TC2 |
| Status | withdrawn |
| Source status | Withdrawn |
| Market | — |
| Technology | Solar |
| Capacity | 240.0 MW |
| State | Pennsylvania |
| County | McKean |
| Point of interconnection | — |
| Requested (queue) date | 2021-09-10 |
| Proposed in-service date | 2028-10-31 |
| Operational date | — |
| Withdrawn date | 2025-12-02 |
| Developer | — |
| Utility / transmission owner | PENELEC |
What changed
| Observed | Field | Old value | New value | Materiality |
|---|---|---|---|---|
| 2026-07-29 | new_project | — | withdrawn | high |
Explore related data
Source last checked2026-08-27
Data last materially changed2026-08-27
Page data generated2026-08-27
Provenance: PJM — new-services interconnection queue. Values are normalized from public source records into the interXdata canonical warehouse; see each source for original filings.