LGE Walton - Monroe (GI-015)

LGE Walton - Monroe is a 220.0 MW gas interconnection project in Walton, Georgia with a current status of operational. It is proposed to connect at LG&E Monroe 230 kV Substation.

220.0 MWCapacity
OperationalStatus
SoutheastMarket
GasTechnology

Project facts

Canonical nameLGE Walton - Monroe
Queue IDGI-015
Statusoperational
Source statusoperational
MarketSoutheast
TechnologyGas
Capacity220.0 MW
StateGeorgia
CountyWalton
Point of interconnectionLG&E Monroe 230 kV Substation
Requested (queue) date2023-12-31
Proposed in-service date
Operational date
Withdrawn date
Developer
Utility / transmission ownerGeorgia Transmission

What changed

No material field-level changes have been recorded for this project since the baseline snapshot. interXdata detects changes as new source snapshots are ingested and diffed against prior state.

Explore related data

Source last checked2026-07-31
Data last materially changed2026-07-31
Page data generated2026-08-27

Provenance: Lawrence Berkeley National Laboratory — Queued Up interconnection dataset. Values are normalized from public source records into the interXdata canonical warehouse; see each source for original filings.

Follow this project and get an alert when its status, capacity, developer, or schedule changes.

Start tracking with interXdata