LGE Washington (aka Tiger Creek) (GI-016)

LGE Washington (aka Tiger Creek) is a 480.0 MW gas interconnection project in Washington, Georgia with a current status of operational. It is proposed to connect at Tiger Creek 230 kV Sub.

480.0 MWCapacity
OperationalStatus
SoutheastMarket
GasTechnology

Project facts

Canonical nameLGE Washington (aka Tiger Creek)
Queue IDGI-016
Statusoperational
Source statusoperational
MarketSoutheast
TechnologyGas
Capacity480.0 MW
StateGeorgia
CountyWashington
Point of interconnectionTiger Creek 230 kV Sub
Requested (queue) date2023-12-31
Proposed in-service date
Operational date
Withdrawn date
Developer
Utility / transmission ownerGeorgia Transmission

What changed

No material field-level changes have been recorded for this project since the baseline snapshot. interXdata detects changes as new source snapshots are ingested and diffed against prior state.

Explore related data

Source last checked2026-07-31
Data last materially changed2026-07-31
Page data generated2026-08-27

Provenance: Lawrence Berkeley National Laboratory — Queued Up interconnection dataset. Values are normalized from public source records into the interXdata canonical warehouse; see each source for original filings.

Follow this project and get an alert when its status, capacity, developer, or schedule changes.