LI Cable - Phase 2b (0293)

LI Cable - Phase 2b is a 280.0 MW wind interconnection project in Suffolk, New York with a current status of withdrawn. It is proposed to connect at Ruland Road 138kV.

280.0 MWCapacity
WithdrawnStatus
KMarket
WindTechnology

Project facts

Canonical nameLI Cable - Phase 2b
Queue ID0293
Statuswithdrawn
Source status0
MarketK
TechnologyWind
Capacity280.0 MW
StateNew York
CountySuffolk
Point of interconnectionRuland Road 138kV
Requested (queue) date2008-04-14
Proposed in-service date2008-12-22
Operational date
Withdrawn date
DeveloperLong Island Cable, LLC
Utility / transmission ownerLIPA

Cross-source records

This project is also observed in: Lawrence Berkeley National Laboratory — Queued Up interconnection dataset. interXdata links these source records without double-counting the project.

What changed

ObservedFieldOld valueNew valueMateriality
2026-07-31new_projectwithdrawnhigh

Explore related data

Source last checked2026-08-27
Data last materially changed2026-08-27
Page data generated2026-08-27

Provenance: New York ISO — interconnection queue. Values are normalized from public source records into the interXdata canonical warehouse; see each source for original filings.