Liberty BESS (1556)

Liberty BESS is a 600.0 MW battery interconnection project in Hudson County, New Jersey with a current status of withdrawn. It is proposed to connect at W49th St 345kV substation.

600.0 MWCapacity
WithdrawnStatus
JMarket
BatteryTechnology

Project facts

Canonical nameLiberty BESS
Queue ID1556
Statuswithdrawn
Source status0
MarketJ
TechnologyBattery
Capacity600.0 MW
StateNew Jersey
CountyHudson County
Point of interconnectionW49th St 345kV substation
Requested (queue) date2023-05-12
Proposed in-service date2024-05-31
Operational date
Withdrawn date
DeveloperNorth Bergen Liberty Generating, LLC
Utility / transmission ownerCONED

Cross-source records

This project is also observed in: Lawrence Berkeley National Laboratory — Queued Up interconnection dataset. interXdata links these source records without double-counting the project.

What changed

ObservedFieldOld valueNew valueMateriality
2026-07-31new_projectwithdrawnhigh

Explore related data

Source last checked2026-08-27
Data last materially changed2026-08-27
Page data generated2026-08-27

Provenance: New York ISO — interconnection queue. Values are normalized from public source records into the interXdata canonical warehouse; see each source for original filings.

Follow this project and get an alert when its status, capacity, developer, or schedule changes.

Start tracking with interXdata