Lima Solar Project (27INR0234)

Lima Solar Project is a 101.3 MW solar interconnection project in Grayson, Texas with a current status of operational. It is proposed to connect at Tap 138 kV Haggerty Switch (12677) to Van Al (1754) 138kV.

101.3 MWCapacity
OperationalStatus
GraysonMarket
SolarTechnology

Project facts

Canonical nameLima Solar Project
Queue ID27INR0234
Statusoperational
Source statusSS Completed, FIS Started, No IA
MarketGrayson
TechnologySolar
Capacity101.3 MW
StateTexas
CountyGrayson
Point of interconnectionTap 138 kV Haggerty Switch (12677) to Van Al (1754) 138kV
Requested (queue) date2024-05-09
Proposed in-service date
Operational date2029-03-01
Withdrawn date
DeveloperIndustrial Lima Project LLC
Utility / transmission ownerERCOT

Cross-source records

This project is also observed in: Lawrence Berkeley National Laboratory — Queued Up interconnection dataset. interXdata links these source records without double-counting the project.

What changed

ObservedFieldOld valueNew valueMateriality
2026-07-31new_projectoperationalhigh

Explore related data

Source last checked2026-08-01
Data last materially changed2026-08-01
Page data generated2026-08-27

Provenance: ERCOT — Generation Interconnection Status (GIS) report. Values are normalized from public source records into the interXdata canonical warehouse; see each source for original filings.

Follow this project and get an alert when its status, capacity, developer, or schedule changes.

Start tracking with interXdata