Lime Wind (57803_T1-6)

Lime Wind is a 3.0 MW wind interconnection project in Baker, Oregon with a current status of operational.

3.0 MWCapacity
OperationalStatus
IPCOMarket
WindTechnology

Project facts

Canonical nameLime Wind
Queue ID57803_T1-6
Statusoperational
Source status(OP) Operating
MarketIPCO
TechnologyWind
Capacity3.0 MW
StateOregon
CountyBaker
Point of interconnection
Requested (queue) date
Proposed in-service date
Operational date2011-12-01
Withdrawn date
Developer
Utility / transmission ownerLime Wind LLC

What changed

ObservedFieldOld valueNew valueMateriality
2026-08-02new_projectoperationalhigh

Explore related data

Source last checked2026-08-03
Data last materially changed2026-08-03
Page data generated2026-08-27

Provenance: U.S. EIA — Form EIA-860M generator inventory (operating + planned). Values are normalized from public source records into the interXdata canonical warehouse; see each source for original filings.

Follow this project and get an alert when its status, capacity, developer, or schedule changes.

Start tracking with interXdata