Limewood Solar (23INR0249)

Limewood Solar is a 204.6 MW solar interconnection project in Bell, Texas with a current status of operational. It is proposed to connect at 3420 Temple Pecan Creek 138kV.

204.6 MWCapacity
OperationalStatus
BellMarket
SolarTechnology

Project facts

Canonical nameLimewood Solar
Queue ID23INR0249
Statusoperational
Source statusSS Completed, FIS Completed, IA
MarketBell
TechnologySolar
Capacity204.6 MW
StateTexas
CountyBell
Point of interconnection3420 Temple Pecan Creek 138kV
Requested (queue) date2021-04-30
Proposed in-service date
Operational date2026-03-02
Withdrawn date
DeveloperLimewood Bell Renewables LLC
Utility / transmission ownerERCOT

Cross-source records

This project is also observed in: Lawrence Berkeley National Laboratory — Queued Up interconnection dataset. interXdata links these source records without double-counting the project.

What changed

ObservedFieldOld valueNew valueMateriality
2026-07-31new_projectoperationalhigh

Explore related data

Source last checked2026-08-01
Data last materially changed2026-08-01
Page data generated2026-08-28

Provenance: ERCOT — Generation Interconnection Status (GIS) report. Values are normalized from public source records into the interXdata canonical warehouse; see each source for original filings.

Follow this project and get an alert when its status, capacity, developer, or schedule changes.

Start tracking with interXdata