Limitless Energy Hub II (27INR0582)

Limitless Energy Hub II is a 1,238.2 MW gas interconnection project in Wilbarger, Texas with a current status of operational. It is proposed to connect at Tap 345kV 6101 RILEY7A - 60505 EDITHCLA7B..

1,238.2 MWCapacity
OperationalStatus
WilbargerMarket
GasTechnology

Project facts

Canonical nameLimitless Energy Hub II
Queue ID27INR0582
Statusoperational
Source statusSS Completed, FIS Started, IA
MarketWilbarger
TechnologyGas
Capacity1,238.2 MW
StateTexas
CountyWilbarger
Point of interconnectionTap 345kV 6101 RILEY7A - 60505 EDITHCLA7B.
Requested (queue) date2025-11-05
Proposed in-service date
Operational date2028-12-01
Withdrawn date
DeveloperLimitless Energy Hub II LLC
Utility / transmission ownerERCOT

Cross-source records

This project is also observed in: Lawrence Berkeley National Laboratory — Queued Up interconnection dataset. interXdata links these source records without double-counting the project.

What changed

ObservedFieldOld valueNew valueMateriality
2026-07-31new_projectoperationalhigh

Explore related data

Source last checked2026-08-01
Data last materially changed2026-08-01
Page data generated2026-08-27

Provenance: ERCOT — Generation Interconnection Status (GIS) report. Values are normalized from public source records into the interXdata canonical warehouse; see each source for original filings.

Follow this project and get an alert when its status, capacity, developer, or schedule changes.

Start tracking with interXdata