Lince Storage (54875)

Lince Storage is a 206.9 MW battery interconnection project with a current status of withdrawn. It is proposed to connect at Manning-Los Banos.

206.9 MWCapacity
WithdrawnStatus
CAISOMarket
BatteryTechnology

Project facts

Canonical nameLince Storage
Queue ID54875
Statuswithdrawn
Source statuswithdrawn
MarketCAISO
TechnologyBattery
Capacity206.9 MW
StateCalifornia
County
Point of interconnectionManning-Los Banos
Requested (queue) date2023-04-17
Proposed in-service date2028-10-31
Operational date
Withdrawn date2024-12-02
Developer
Utility / transmission ownerPGAE

What changed

No material field-level changes have been recorded for this project since the baseline snapshot. interXdata detects changes as new source snapshots are ingested and diffed against prior state.

Explore related data

Source last checked2026-07-31
Data last materially changed2026-07-31
Page data generated2026-08-28

Provenance: Lawrence Berkeley National Laboratory — Queued Up interconnection dataset. Values are normalized from public source records into the interXdata canonical warehouse; see each source for original filings.

Follow this project and get an alert when its status, capacity, developer, or schedule changes.

Start tracking with interXdata