Lincoln – Midway 230 Line (GI-TC-2024-26)

Lincoln – Midway 230 Line is a 199.0 MW solar interconnection project in Elbert County, Colorado with a current status of active. It is proposed to connect at Lincoln – Midway 230 Line.

199.0 MWCapacity
ActiveStatus
COMarket
SolarTechnology

Project facts

Canonical nameLincoln – Midway 230 Line
Queue IDGI-TC-2024-26
Statusactive
Source statusIA FULLY EXECUTED/ON SCHEDULE
MarketCO
TechnologySolar
Capacity199.0 MW
StateColorado
CountyElbert County
Point of interconnectionLincoln – Midway 230 Line
Requested (queue) date2023-05-31
Proposed in-service date2027-08-17
Operational date—
Withdrawn date—
Developer—
Utility / transmission ownerTSGT

Cross-source records

This project is also observed in: Lawrence Berkeley National Laboratory — Queued Up interconnection dataset. interXdata links these source records without double-counting the project.

What changed

ObservedFieldOld valueNew valueMateriality
2026-07-31new_project—activehigh

Explore related data

Source last checked2026-10-12
Data last materially changed2026-10-12
Page data generated2026-10-12

Provenance: Southwest Power Pool — generator interconnection queue. Values are normalized from public source records into the interXdata canonical warehouse; see each source for original filings.