Lincoln – Midway 230 Line (GI-TC-2024-26)
Lincoln – Midway 230 Line is a 199.0 MW solar interconnection project in Elbert County, Colorado with a current status of active. It is proposed to connect at Lincoln – Midway 230 Line.
199.0 MWCapacity
ActiveStatus
COMarket
SolarTechnology
Project facts
| Canonical name | Lincoln – Midway 230 Line |
|---|---|
| Queue ID | GI-TC-2024-26 |
| Status | active |
| Source status | FACILITY STUDY STAGE |
| Market | CO |
| Technology | Solar |
| Capacity | 199.0 MW |
| State | Colorado |
| County | Elbert County |
| Point of interconnection | Lincoln – Midway 230 Line |
| Requested (queue) date | 2023-05-31 |
| Proposed in-service date | 2027-08-17 |
| Operational date | — |
| Withdrawn date | — |
| Developer | — |
| Utility / transmission owner | TSGT |
Cross-source records
This project is also observed in: Lawrence Berkeley National Laboratory — Queued Up interconnection dataset. interXdata links these source records without double-counting the project.
What changed
| Observed | Field | Old value | New value | Materiality |
|---|---|---|---|---|
| 2026-07-31 | new_project | — | active | high |
Explore related data
Source last checked2026-08-27
Data last materially changed2026-08-27
Page data generated2026-08-27
Provenance: Southwest Power Pool — generator interconnection queue. Values are normalized from public source records into the interXdata canonical warehouse; see each source for original filings.
Follow this project and get an alert when its status, capacity, developer, or schedule changes.
Start tracking with interXdata