Lincoln - Midway 230 Line (GI-TC-2024-31)

Lincoln - Midway 230 Line is a 398.0 MW solar interconnection project in Elbert County, Colorado with a current status of active. It is proposed to connect at Lincoln - Midway 230 Line.

398.0 MWCapacity
ActiveStatus
COMarket
SolarTechnology

Project facts

Canonical nameLincoln - Midway 230 Line
Queue IDGI-TC-2024-31
Statusactive
Source statusFACILITY STUDY STAGE
MarketCO
TechnologySolar
Capacity398.0 MW
StateColorado
CountyElbert County
Point of interconnectionLincoln - Midway 230 Line
Requested (queue) date2024-05-29
Proposed in-service date2028-12-31
Operational date
Withdrawn date
Developer
Utility / transmission ownerTSGT

Cross-source records

This project is also observed in: Lawrence Berkeley National Laboratory — Queued Up interconnection dataset. interXdata links these source records without double-counting the project.

What changed

ObservedFieldOld valueNew valueMateriality
2026-07-31new_projectactivehigh

Explore related data

Source last checked2026-08-27
Data last materially changed2026-08-27
Page data generated2026-08-27

Provenance: Southwest Power Pool — generator interconnection queue. Values are normalized from public source records into the interXdata canonical warehouse; see each source for original filings.