Line Tap between Edwardsport and Amo 345kV (S1008)

Line Tap between Edwardsport and Amo 345kV is a 250.0 MW generation interconnection project with a current status of withdrawn. It is proposed to connect at Line Tap between Edwardsport and Amo 345kV.

250.0 MWCapacity
WithdrawnStatus
Market
GenerationTechnology

Project facts

Canonical nameLine Tap between Edwardsport and Amo 345kV
Queue IDS1008
Statuswithdrawn
Source statusWithdrawn
Market
TechnologyGeneration
Capacity250.0 MW
StateIndiana
County
Point of interconnectionLine Tap between Edwardsport and Amo 345kV
Requested (queue) date2021-08-04
Proposed in-service date2022-12-31
Operational date2022-12-31
Withdrawn date2025-04-25
Developer
Utility / transmission ownerDuke Energy Progress

Cross-source records

This project is also observed in: Lawrence Berkeley National Laboratory — Queued Up interconnection dataset. interXdata links these source records without double-counting the project.

What changed

ObservedFieldOld valueNew valueMateriality
2026-07-29new_projectwithdrawnhigh

Explore related data

Source last checked2026-08-27
Data last materially changed2026-08-27
Page data generated2026-08-27

Provenance: MISO — generator interconnection queue. Values are normalized from public source records into the interXdata canonical warehouse; see each source for original filings.

Follow this project and get an alert when its status, capacity, developer, or schedule changes.