Line tap of existing Leland Olds (Secondary) - Groton 345 kV line (GEN-2022-245)

Line tap of existing Leland Olds (Secondary) - Groton 345 kV line is a 200.0 MW battery interconnection project in Kidder, North Dakota with a current status of withdrawn. It is proposed to connect at Line tap of existing Leland Olds (Secondary) - Groton 345 kV line.

200.0 MWCapacity
WithdrawnStatus
NDMarket
BatteryTechnology

Project facts

Canonical nameLine tap of existing Leland Olds (Secondary) - Groton 345 kV line
Queue IDGEN-2022-245
Statuswithdrawn
Source statusWITHDRAWN
MarketND
TechnologyBattery
Capacity200.0 MW
StateNorth Dakota
CountyKidder
Point of interconnectionLine tap of existing Leland Olds (Secondary) - Groton 345 kV line
Requested (queue) date2022-03-10
Proposed in-service date2028-09-15
Operational date
Withdrawn date2023-11-06
Developer
Utility / transmission ownerBEPC

Cross-source records

This project is also observed in: Lawrence Berkeley National Laboratory — Queued Up interconnection dataset. interXdata links these source records without double-counting the project.

What changed

ObservedFieldOld valueNew valueMateriality
2026-07-31new_projectwithdrawnhigh

Explore related data

Source last checked2026-08-27
Data last materially changed2026-08-27
Page data generated2026-08-27

Provenance: Southwest Power Pool — generator interconnection queue. Values are normalized from public source records into the interXdata canonical warehouse; see each source for original filings.

Follow this project and get an alert when its status, capacity, developer, or schedule changes.

Start tracking with interXdata